[Nov-2021] CTAL-TAE Braindumps - CTAL-TAE Questions to Get Better Grades [Q13-Q32]

Share

[Nov-2021] CTAL-TAE Braindumps – CTAL-TAE Questions to Get Better Grades

CTAL-TAE Exam Dumps - Try Best CTAL-TAE Exam Questions - PassLeader


ISQI CTAL-TAE Exam Syllabus Topics:

TopicDetails
Topic 1
  • Specify test sequences or fully-fledged test behaviors
  • Analyze factors of implementation, use, and maintenancerequirementsfor a given TAS
Topic 2
  • Analyze the SUT responses during test executionto steer subsequent test runs
  • Understanddesign considerations for a TAA
Topic 3
  • Developing, capturing, or deriving test data
  • Providing access to test libraries as needed
Topic 4
  • Understand "design for testability" and "design for test automation" methodsapplicable to the SUT
  • Analyze a system under test to determine theappropriateautomation solution
Topic 5
  • Ability to trace the generated tests back to the model
  • Explaintherole that layers play within a TAA
Topic 6
  • Relate test cases to test objectives or SUT requirements
  • Configure and parameterize the test setup
Topic 7
  • Explain the factors to be considered when identifyingreusability of components
  • Interpret both test data and test cases and transform them into executable scripts

 

NEW QUESTION 13
What is NOT a factor in considering when you are asked to ensure an effective transition from manual to automated tests?

  • A. Correctness of test data and test cases
  • B. The look andfeel of the SUT
  • C. Complexity to automate the manual test cases
  • D. The controllability of the SUT

Answer: B

 

NEW QUESTION 14
You are using a gTAA to create a TAS for a project. The TAS is aimed specifically at automating a suit of existing manual test cases for standalone desktop applications. All the interfaces between the TAS and SUT will be from the CUI of the application.
Which of the following layers of the gTAA should you focus on for the TAS?

  • A. The Test Definition layer
  • B. The Test Adaption layer
  • C. The Test Execution layer
  • D. The test Generation layer

Answer: D

 

NEW QUESTION 15
Consider the following layers of the gTAA structure:
a.Test generation layer
b.Test definition layer
c.Test execution layer
d.Test execution layer
Consider the following capabilities associated with these layers.
Acquire all the necessary resources before each test and release all after run, in order to avoid interdependences between test Allow the automated test scripts on an abstract level to interact with components, configurations and interfaces of the SUT.
Design test directives that allow configuring the algorithms used to automatically produce the test cases a given model of the SUT.
Allow the definition and implementation of test cases and data by means of templates and/or guidelines.
Which of the following BEST matches each layer with the appropriate capability?

  • A. a-4, b-3, c-2, d-1
  • B. a-4, b-3, c-1, d-2
  • C. a-3, b-4, c-2, d-1
  • D. a-3, b-4, c-1, d-2

Answer: A

 

NEW QUESTION 16
Assume that you are the TAE responsible for the correct functioning of a TAS, deployed in a test environment that consists of a few machines running the same version of the operating system. The TAS has been working and stable since its deployment, it has been used to run an automated test suite consisting of many similar automated test. The infrastructure team is planning to update the operating system on these machines by installing a new the service pack for security reasons. Since the vendor of the operating system assurance full backward compatibility, the infrastructure team assurance that there will be no impacts on the functioning of the TAS.
What is the BEST approach to confirm the correct functioning of the TAS in this scenario?

  • A. Verify the behavior of the whole automated test suite by running all the automated tests
  • B. Make sure that the infrastructure team has completed installing the service pack on the machines where SUT is running, then run the whole automated test suite to verify its behavior
  • C. Do not run any tests because you can immediately confirm the correct functioning of the automated test suite
  • D. Verify the behavior of the automated tests by running a small tests, then gradually run the remaining tests to confirm the correct functioning of the whole automated test suite.

Answer: C

 

NEW QUESTION 17
Which of the following success factors for a test automation project is TRUE?

  • A. Automated tests that fail due to changes in the requirements of the SUT should be promptly fixed rather than disabled from the test suite
  • B. Automated tests must be designed to capture only the data that is strictly needed for comparing expected and actual results
  • C. The test cases to be automated first must always be selected based on the number of times a test will need to be run
  • D. The test cases to be automated must have a high dependency on particular data values

Answer: A

 

NEW QUESTION 18
Your goal is to verify completeness, consistency and correct behavior of an automated test suite. The TAS has been proven to successfully install in the SUT environment. All the preliminary checks to verify the correct functioning of the automated test environment and test tool configuration, installation and setup have successfully completed.
Which of the following is NOT a relevant check for achieving your goal in this scenario?

  • A. Checking whether theloading of the TAS is repeatable in the SUT environment
  • B. Checking whether the post condition have been fulfilled for all the test cases
  • C. Checking whether all the test cases produce repeatable outcomes
  • D. Checking whether all the test cases contain the expected results

Answer: C

 

NEW QUESTION 19
Consider a TAS that exclusively uses the APIs of a SUT. To make this work, significant changes have been required to the SUT by adding a set of dedicated test interfaces to the APIs. All the automated tests will use these test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.
Which of the following would you expect to be the MOST specific risk associated with this scenario?

  • A. The connectivityfrom the TAS to the dedicated test interfaces will not work
  • B. The process of configuring the TAS will be error-phone due to manual intervention
  • C. The automated test cases will not contain the expected result
  • D. False alarms, that are unlikely to occur inthe real world, will be observed during testing

Answer: D

 

NEW QUESTION 20
Which of the following statements BEST describe aspects of the SUT to consider when designing a TAA?

  • A. All the interface of the SUT affected by the tests should be controllable by the TAA
  • B. All the interaction between SUT and TAS should be logged with the highest level of detail
  • C. All the internal test interfaces of the SUT should be removed prior to the product release
  • D. All the external test interfaces of the SUT should be removed prior to the product release

Answer: B

 

NEW QUESTION 21
Which of the following BEST describes why it is important to separate test definition from test execution in a TAA?

  • A. It allow choosing different paradigms (e.g event-driven) for the interaction TAS and SUT
  • B. It allows testers to find more defects on the SUT
  • C. It allows specify test cases without being closely tied to the tool to run them against the SUT
  • D. It allows developing steps of the test process without being closely tied to the SUT interface.

Answer: B

 

NEW QUESTION 22
Which of the following attributes should NOT be included in a test execution report associated with a suite of automated tests?

  • A. Environment in which the tests have been executed
  • B. Defect clusters identified during test execution
  • C. System/Application under test and its version
  • D. Summary of the test execution results

Answer: D

 

NEW QUESTION 23
Which of the following statements about the reuse of TAS artefacts is TRUE?

  • A. Reusable TAS artifacts associated with the definition layer of the TAA include the adaptors to the SUT components and/or interfaces
  • B. Communications maintenance and improvements for reusing TAS artefacts are modify addressed during the design of the TAA
  • C. To enable reuse of TAS artefacts, a good design for reuse is built into the TAA and to further action are needed during the TAS lifecycle
  • D. Reusable TAS artefacts can include components (or parts of components) associated with different layers of the TAA

Answer: D

 

NEW QUESTION 24
A web application was released into production one year ago, it has regular release which follow a V-model lifecycle and testing is well-established and fully integration into the development lifecycle. You have beenasked to implement a TAS for the regression test suite. The regression tests have been developed via the GUI and are expected to be run at least four times a month, for each planned release, for the whole operation solution life of the system (six years). Each screen of the GUI uses several third-party controls which are not compatible with the existing automation solutions. The environment for the automation will be stable, fully controllable and separated from other environments (development, staging, production).
What could be the MOST problematic for this TAS?

  • A. Complexity to automate
  • B. Sustainability of the automated environment
  • C. Maturity of the test process
  • D. Frequency ofuse

Answer: B

 

NEW QUESTION 25
A project consists of distributed teams working in a 24-hour environment, where activities happen at all hours of the day. This project adopts a CI (Continuous Integration) process when developer check-in code and consists of automated activities that include generating a build and deploying it to a test environment.
Automated integration tests are run multiple times a day. The project have asked for a report containing the automation test results for every build, which must be available 24/7 to the project team.
Which of the following would be the BEST way to automatically provides this report?

  • A. Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds), use this database to automatically update a dashboard containing the build history and test results accessible to the project team.
  • B. Store the execution result of the integration tests for the last build to a database (overwriting the results from the previous build), automatically create atest execution report for this build send It via e-mail to the project team
  • C. Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds). Automatically create a test execution report for this build and send it via e-mail to the project team
  • D. Store the code coverage results of the integration tests for the last build to a database (without overwriting the results from the previous builds). And automatically create a chart showing the trend in code coverage and send via email to the project team.

Answer: A

 

NEW QUESTION 26
You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the
11thtest. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.
What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11thtest?

  • A. Re-run the test automation suite starting from the 12thtest
  • B. Re-run the test automation suite starting from the 1sttest.
  • C. Take a backup of the database in its current state. So It can be analyzed later
  • D. Return the database to a consistent state that allows subsequent test to run

Answer: C

 

NEW QUESTION 27
You are reviewing the testability of your SUT.
Which of the following BEST refers to the characteristic of OBSERVABILITY?

  • A. The ability of the SUT to prevent unauthorized access to its components or data.
  • B. The ability to exercise the SUT by entering inputs, triggering events and invoking methods
  • C. The ability of the SUT to perform its intended function for a specified period of time
  • D. The ability to identify states, outputs, intermediate result and error messages in the SUT

Answer: C

 

NEW QUESTION 28
You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.
In the pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automationregimefor the tests is not yet mature.
Which of the following statements is TRUE?

  • A. The test process should be radically changed to gain additional benefits from using the tool.
  • B. The target defined for the project was inappropriate, because the automationregimeforthe automated tests at the end of the pilot is not yet mature.
  • C. The pilot project should have been critical so that maximum benefits were delivered
  • D. The approach used for deployed this tool is aligned to the standard success factor for deployment

Answer: A

 

NEW QUESTION 29
Which of the following BEST describes why it is important to separate test definition from test execution in a TAA?

  • A. It allow choosing different paradigms (e.g event-driven) for the interaction TAS and SUT
  • B. It allows specify test cases without being closely tied to the tool to run them against the SUT
  • C. It allows testers to findmore defects on the SUT
  • D. It allows developing steps of the test process without being closely tied to the SUT interface.

Answer: B

 

NEW QUESTION 30
You have been asked todeterminea TAS for a new release of a SUT, test should be automatedwherever. The new release will consist of 5 new interfaces and an amendment to 3 existing interfaces. The new and amended interface will be deliver incrementally in 3 sprints, each lasting 2 weeks.
What would be the BEST Test Automation Solution (TAS) design in this scenario?

  • A. Automate tests at both Component and System Level. Only do this automation once every interface has been fully developed or amended and manual testing has completed successfully.
  • B. Automate the tests at two levels, Component and System level. Create customized hooks at Component level for interface not yet developed or amended. Only use the newly developed or amended interfaces to test at System level.
  • C. Automate tests at one level only, System level. Use only the newly developed interfaces and do not create any customized interfaces/test hooks.
  • D. Automate a test at once level, component level, Create customized interface/test hooks for this level where the interface has not yet been developed or amended.

Answer: A,B

 

NEW QUESTION 31
You are reviewing the testability of your SUT.
Which of the following BEST refers to the characteristic of OBSERVABILITY?

  • A. The ability of the SUT to prevent unauthorized access to its components or data.
  • B. The ability to exercise the SUT by entering inputs, triggering events and invoking methods
  • C. The ability of the SUTto perform its intended function for a specified period of time
  • D. The abilityto identify states, outputs, intermediate result and error messages in the SUT

Answer: D

 

NEW QUESTION 32
......

Verified CTAL-TAE exam dumps Q&As with Correct 41 Questions and Answers: https://certkiller.passleader.top/ISQI/CTAL-TAE-exam-braindumps.html